Categories

Address: No.3, A-8, E-Pang Road,Lianhu District,Xi'an City,Shaanxi Province,china 710086


Telephone: 029-84519892

Email: xf@xf-stainless-steel.com


www.xf-stainless-steel.com 


310s Stainless Steel Pipe

Xi'an Xuanfa Stainless Steel Co.,Ltd is one of the professional 310s stainless steel pipe manufacturers and suppliers equipped with productive factory, welcome to check tp310s ss pipe, tp310s hollow bar, a312 tp310s stainless steel pipe, a213 tp310s stainless steel pipe, 310s seamless...

Product Details

Xi'an Xuanfa Stainless Steel Co.,Ltd is one of the professional 310s stainless steel pipe manufacturers and suppliers equipped with productive factory, welcome to check tp310s ss pipe, tp310s hollow bar, a312 tp310s stainless steel pipe, a213 tp310s stainless steel pipe, 310s seamless stainless steel pipe list and import high quality products from us.


Email:xf@xf-stainless-steel.com


Products:310s welded stainless steel pipe/310s seamless stainless steel pipe

Materials:310s

Standard: ASTM A554 A511 A814 A249 A312 A213 JIS G3459 JIS 3463

Outer Diameter:10-600mm1/2'' to 26'',DN6 to DN650  

Wall Thickness:0.3-12mm,Sch5s to Sch80s

Length:1m to 12m or customized

Surface treatment:180#,240#,320# hairline, 400#,600# mirror polish

Application:

1.General industries:petroleum,food,chemical,paper,fertilizer,fabric,aviation and nuclear .

2.Decoration field :handrail,railing,staircase,weldmesh,screen,door,window,balcony,fence,bench, furniture.

3.Fluid, gas and oil transport

4.Pressure and heat transmission

5.Construction and ornament

6.Boiler heat exchangers.


Chemical analysis:Cr:18.00%-20.00%  Ni:11.00-14.00 Mo:3.0-4.0

Packing:woven bags and wooden case


Process Of Seamless Pipe:

MOQ:1 ton per specification

Shipping:FCL.LCL,Buck ship

Lead Time:15 to 20 days after the receipt of deposite

Loading Port:Shanghai,Ningbo

Payment Terms:30% T/T in advance,70% balanced before delivery.


Our advantage:

1.Annual production capacity:50,000 Mertic Ton

2.With at least 80 tons stock for general specification

3.Quote within 12 hours

4.2 hours drive to nearest seaport

5.Delivery maximum 10 days for stock   


Inquiry